Case study - Rugeley Power Station

Powertherm were awarded the contact to provide both the insulation work and the scaffold and temporary access structure contract, based upon their technical ability and successful completion of the Allington Energy from Waste Project. This project was based between 2008 – 2010

Need info on the insulation job

Powertherm used the cuplock system for the scaffold part of the contract. This system assisted in reducing the time required for the contract, due to the ease in which it can be installed and offered the client peace of mind from a safety perspective.

About

  • Based in Staffordshire
  • Generating sets were commissioned between 1961 and 1962
  • Committed to the generation of low cost electricity in a safe and environmentally responsible manner
  • Part of a joint venture between International Power Ltd and Mitsui & Co Ltd.
  • International Power Ltd is a wholly owned subsidiary of GDF SUEZ

Problem

  • Reduce the sulphur emission from coal fired burners

Solution

  • Install a Flue Gas Desulphurisation Unit
  • Erection of scaffold and temporary structures to perform the work